Technical Data; Installation - IB RUBINETTERIE BOLD 313 Fitting Instructions Manual

Exterior
Table of Contents

Advertisement

Available languages

Available languages

EN

TECHNICAL DATA

Minimum dynamic pressure:_________________________________________________________0.5 bar
Maximum operational pressure:________________________________________________________5 bar
Recommended operational pressure:_________________________________________________1-5 bar
It's recommended to use a pressure reducer in case of
static pressure superior than 5 bar inside the waterpipe.
Maximum hot water temperature:_______________________________________________________80°C
INSTALLATION, MAINTENANCE AND PRELIMINARY CHECKING PROCEDURE
In order to get your device work correctly and fi ne in time, must ensure compliance with the
mode of installation and maintenance described in this booklet. Relying on a qualifi ed plumber.
Make sure that the system is free from all debris and impurities existing.

INSTALLATION

Fig. 1: Insert the plate on the built-in body.
Fig. 2: Fix the lever on the cartridge rod, inserting the anti-friction ring into the ring nut.
Screw the screw until it is completely locked.
Fig. 3: Screw the joint to the shower support. Connect the hose to the shower support and to
the showerhead.
After connecting the body to the system, turn on the stopcocks and check that the mixer tap
unit operates correctly. Keep the tap pressurised for a few minutes checking eventual leaks.
CLEANING
In order to obtain a correct cleanliness, exclusively wash them with soap and water, rewash and
dry them with a soft towel and deerskin. Avoid the usage of alcohol, solvents, solid or liquid
detergents which contain corrosive or acidic substances, abrasive sponges, swab with metallic
strings because they could irreversibly compromise the surfaces.
THE USAGE OF THIS KIND OF DETERGNETS DURING THE CLEANING OF THE MIXER EXCLUDE
IB RUBINETTERIE FROM ANY WARRANTY OBLIGATION.

Advertisement

Table of Contents
loading

Table of Contents