Kohler BEAM K-77691K-G Installation Instructions
Kohler BEAM K-77691K-G Installation Instructions

Kohler BEAM K-77691K-G Installation Instructions

Urinal flush valve

Advertisement

Quick Links

BEFORE YOU BEGIN

BEFORE YOU BEGIN
·
Congratulation on your purchase of this high quality
Bathroom Accessory. Before proceeding with the
Installation, please carefully read this installation
instruction in order to ensure proper care and assembly of
this accessory.
·
Please keep this installation instruction for future
reference.
Prior to drilling into walls, check there are no hidden
electrical wires, cables or water supply pipes with the
aid of ar, electronic detector. If you use power tools do
not forget:
1. Wear eye protection.
2. Unplug equipment after use.

TOOLS AND ACCESSORIES

TOOLS AND ACCESSORIES
Drill
Wrench

ROUGHING-IN

Reference Value
(
G1/2)
KOHLER CHINA INVESTMENT CO., LTD
1296231-T01-C
Leveling Instrument
Screw X9
9
144
Kohler reserves the right to change marked dimensions without prior notice.
JING'AN DISTRICT, SHANGHAI, PRC
(
)
K-77691K-G/K-77692K-G/K-77693K-G
·
·
1.
2.
Screw Driver
Saw
1.5mmHex Wrench
1.5mm
194.5
(
G3/4)
Fig.1
200
1
NO.158, JIANG CHANG SAN ROAD,
POST CODE: 200436
158
©
Copyright Kohler China Investment Co., Ltd. 2017
-1-
©
BEAM
INSTALLATION INSTRUCTIONS
URINAL FLUSH VALVE
Tape
Hammer
G1/2 & G3/4 Screw Die Machince
G1/2 G3/4
UNIT : mm
62
200436
2017

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the BEAM K-77691K-G and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Kohler BEAM K-77691K-G

  • Page 1 ROUGHING-IN Reference Value UNIT : mm 194.5 G1/2) G3/4) Fig.1 Kohler reserves the right to change marked dimensions without prior notice. KOHLER CHINA INVESTMENT CO., LTD NO.158, JIANG CHANG SAN ROAD, JING'AN DISTRICT, SHANGHAI, PRC POST CODE: 200436 200436 ©...
  • Page 2 SPECIFICATIONS K-77691K-G/K-77692K-G/K-77693K-G Flush Volume 0.5L, 1L, 3L Minimum Water Pressure 0.05mpa(Dynamic Pressure 0.75mpa(Static Pressure Maximum Water Pressure Water Temperature 1 ~50 INSTALLATION 1. Drill wall Draw lines and drill the wall according to Fig.2. The horizontal distance between the bottom of plate and the top surface of 230mm urinal is advised to be 230mm.
  • Page 3 3. Cut box Cut the excessive part of the box as shown. Fig.4 4. Install valve assembly Fix valve assembly onto inlet and outlet pipes with wrench as shown in Fig.5. Fix onto inlet pipe · · Process inlet pipe thread and fix inlet pipe connector. ·...
  • Page 4 5. Cut and fix tile Cut tiles as shown in Fig.6. 124mm-130mm Fig.6 6. Fix bottom board · · Tighten the 6 screws on the bottom board. · Cut the rod connector according to the depth into the tile · (17.8 );...
  • Page 5 7. Fix faceplate · · Put the faceplate onto the bottom board. · · Pull the faceplate downwards. · · Tighten the rod with L wrench. Note: When removing the faceplate, unscrew the screw 3mm out and push the faceplate 3.5mm upwards to remove it. 3.5mm Snap Pull...

This manual is also suitable for:

Beam k-77692k-gBeam k-77693k-g

Table of Contents