Overload Stop Adjustments; Four Mounting Bolts That Secure The Bottom Frame To The Load Cell; Overload Stops - OHAUS Defender D30BR Service Manual

Defender bases - dry-use (b series) - wet-use (v series)
Hide thumbs Also See for Defender D30BR:
Table of Contents

Advertisement

CHAPTER 3 MAINTENANCE AND REPAIR PROCEDURES
3.2
Replacing the Load Cell
4. Remove the bottom Load Cell
Mounting Bolts, washers and spacer.
The Load Cell assembly can now be
removed from the Lower Frame.
5. Install the new Load Cell following
steps 1 through 4 in reverse order.
3.3

Overload Stop Adjustments

The Overload Stop gaps must be checked and reset if the Load Cell is replaced.
1. Remove the Platform and loosen the Jam Nuts, first on the four Overload Stops on the
top side of the Frame, then on the bottom. (See Figures 3-3, 3-4 and 3-5.)
2. Use the appropriate size feeler gauge in the Gap (see Table 3-1), and turn the set
screws until a slight drag is felt on the feeler.
3. Tighten the Jam Nut and re-check
the Gap.
4. Re-adjust if necessary.
5. Cover the Platform and check for full capacity
Ohaus Corporation www.ohaus.com
Figure 3-2. Four Mounting Bolts that secure
the Bottom Frame to the Load Cell.
Figure 3-3. Overload Stops
3-2
Defender™ B & V Series Service Manual

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents