Vax U91-P5 Series Instruction Manual page 10

Table of Contents

Advertisement

Vax U91-P5 & 6 Series User Guide.qxd:UG
vax.co.uk
5. Remove the nozzle guard by removing the four (4)
screws. Look for any obstructions and remove brushbar if
necessary (Fig.8/5).
Fig.8/5
Clearing Blockages from the TurboTool™
Fig.8/6
Fig.8/7
1. Turn the TurboTool™ over and slide off the locking ring
(Fig.8/6).
2. Pivot lowering housing and remove clog (Fig.8/7).
10
clearing blockages
2/4/09
3. To re-assemble, be sure that the tabs are engaged. Pivot
the lower housing closed. Slip the locking ring into the
groove at the neck of the TurboTool™ to complete
reassembly (Fig.8/8).
Fig.8/8
LOCKING RING
17:48
Page 10
TABS

Advertisement

Table of Contents
loading

This manual is also suitable for:

U91-p6 series

Table of Contents