Download Print this page

Installation - Star Progetti STAR7 BLUEAPP BOX Operating Instructions Manual

Power regulator

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 10
STAR7 HEAT power regulator OPERATING INSTRUCTIONS (cod.
STAR7)
Thank you for purchasing the STAR7 heat power regulator. STAR7 is a
high-quality product that is built to last.
All Helios IRK heaters can be
equipped with STAR heat power regulators. Our heat power regulators
ensure maximum flexibility in heat control and are constructed using the
latest microprocessor technology.
All power regulators are checked before shipping to ensure their efficiency.

INSTALLATION

The STAR7 power regulator must always be wall mounted on a non-
flammable and stable surface (e.g. tiles, cement, steel). The power
regulator must be installed by attaching the housing in an upright position
with the heat sink at the top. The power and load cables must be of
an appropriate size and insulated. The earth conductor for the power
supply and the load must be longer than the others so that they are the last
to tauten in case the cable clamp loosens. The power regulator must not be
installed inside containers or cabinets because a lack of ventilation can
cause damage. Use power and load cables that are able to withstand at
least 90°. When installing, an omnipolar circuit-breaker with a contact
opening of at least 3.5 mm must be used.
The signal receiver may be disturbed when other electrical frequencies
are transmitted from other appliances operating in the same area that have
the same frequencies.
13

Advertisement

loading
Need help?

Need help?

Do you have a question about the STAR7 BLUEAPP BOX and is the answer not in the manual?

Subscribe to Our Youtube Channel