10.
Apply a generous amount around the edges of the flat plates inside the gutter and
ensure all gaps are filled with Sudaflex internally.
STEP 7a
Fitting the Gallows Support Bar
The gutter support bar is designed to span from post to post or from post to end cap underneath
the gutter, fix the bar through the gutter channel using self drillers every 300mm both sides of the
gutter as shown in the below diagram.
STEP 8
Stand Post & Gutter Beam Up
Using the excavated hole, position each of the posts into the centre of the hole and lean the whole
frame forward so that the back of the posts leans against the front of the hole; please see diagram
overleaf.
If the posts are to be surface mounted, please secure the posts ensuring they are plum and square.
STEP 9
Fitting of the Glazing Bars
Pre-drill the glazing bar that is going to fit into the gutter section. 15mm in from the edge and 30mm
from the end of the bar drill your 6.5mm hole. Do this on both sides of the bar. This will allow the
glazing bar to overhang the gutter section. Please see the images below.
8