Operation Procedure / Cara Mengoperasikan - ICA CT Series User Manual

Table of Contents

Advertisement

VII. OPERATION PROCEDURE / CARA MENGOPERASIKAN
1. Turn on procedure.
a. Press on power button at the front panel.
b. Turn on the load connected to the outlet.
2. When the line power is interrupted.
In case of line power is interrupted (off or voltage is too
low), inverter converts the battery power to AC power
automatically with transfer time
sound at interval 4 seconds. When the battery is near the
end of its capacity, buzzer will sound continuously. At
this time data should be stored and all load shutdown.
3. Turn off procedure.
a. Turn off all the load connected to the outlet.
b. Press on power button at the front panel.
Notes :
The UPS battery should charge for at least 10 hours to
ensure sufficient runtime. The unit is being charged
whenever it is connected to utility power, and UPS must be
turn ON.
4 ms. Buzzer will
<
1. Cara menghidupkan
a. Tekan tombol daya pada panel depan.
b. Hidupkan beban yang terpasang pada stopkontak
keluaran
2. Saat listrik jala-jala terganggu.
Saat listrik jala-jala terganggu (padam atau tegangannya
terlalu rendah), inverter langsung bekerja dengan waktu
alih
4 ms mengubah daya baterai menjadi arus listrik
<
AC. Buzzer akan berbunyi putus-putus selang 4 detik.
Saat baterai hampir habis buzzer akan berbunyi
sinambung. Pada saat ini data harus sudah tersimpan dan
semua beban harus sudah dimatikan.
3. Cara mematikan.
a. Matikan semua beban yang terpasang pada UPS.
b. Tekan tombol daya pada panel depan.
Catatan :
Battery UPS harus di isi sekurangnya 10 jam untuk
memastikan UPS beroperasi dengan memadai. Unit akan
mengisi bilamana dihubungkan dengan sumber listrik, dan
UPS harus dihidupkan.
8

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ct 382bCt 682bCt 1082bCt 1382bCt 1682b

Table of Contents