Download Print this page
MetalTech M-MFT5710 Operational Safety And Assembly Instructions

MetalTech M-MFT5710 Operational Safety And Assembly Instructions

Scaffolding tower

Advertisement

Quick Links

OPERATIONAL SAFETY AND
ASSEMBLY INSTRUCTIONS
READ THESE INSTRUCTIONS CAREFULLY BEFORE USING THIS PRODUCT.
KEEP THIS MANUAL HANDY FOR FUTURE REFERENCE.
SCAFFOLDING
OSHA
TOWER
CONFORMANCE TO
29 CFR Pt. 1926
ANSI
MEETS CODE A10.8
MODELS: M-MFT5710/M-MFT5710-A
Picture may differ from actual product

Advertisement

loading
Need help?

Need help?

Do you have a question about the M-MFT5710 and is the answer not in the manual?

Questions and answers

Summary of Contents for MetalTech M-MFT5710

  • Page 1 OSHA TOWER CONFORMANCE TO 29 CFR Pt. 1926 ANSI MEETS CODE A10.8 MODELS: M-MFT5710/M-MFT5710-A OPERATIONAL SAFETY AND ASSEMBLY INSTRUCTIONS Picture may differ from actual product READ THESE INSTRUCTIONS CAREFULLY BEFORE USING THIS PRODUCT. KEEP THIS MANUAL HANDY FOR FUTURE REFERENCE.
  • Page 2 SET-UP INSTRUCTIONS Place sills on the ground and put the adjustable levelling Install the second frame onto the levelling jack. jack plates on the sills. Secure the first cross brace to the second frame. Adjust the nuts of the levelling jack, starting at the highest Secure the second cross brace to both frames.
  • Page 3 Install the 3 aluminium platforms at the same level. Install the guardrail posts onto the coupling pins seated on top of the frames. Secure the platforms to the frames using the locks beneath the platforms. Put a pig tail lock through the top and bottom of each coupling pin to avoid any separation.
  • Page 4 KEEP THIS MANUAL FOR FUTURE REFERENCE Keep this manual and the original sales invoice in a safe, dry place for future reference. WWW.METALTECH.CO 1 800 363-7587 Metaltech is a registered trademark of Metaltech-Omega inc. LAVAL, QUEBEC, CANADA H7L 3N6 IN-MFT5710.5710A-EN02...

This manual is also suitable for:

M-mft5710-a