Installation Procedure
The installation procedure is the reverse of the removal procedure.
Note:
• After installation, bleed air from the fuel system.
• Prepare an oil receiver since the hydraulic oil will run out when the piping is disconnected.
Caution:
At the time of maintenance, inspection, adjustment or replacement of the torque converter ASSY,
remove the parking brake air chamber before disconnecting the battery
Point Operations
[Point 1]
Removal
Installation:
Disconnect the piping to make the material handling pump
as illustrated at left.
[Point 2]
Removal
Installation:
Hoisting
Position
Engine side
:2 places
Torque converter side
:1 place
Caution:
Do not remove the torque converter level gage piping
but fix it on the engine side.
[Point 3]
Removal
Installation:
Remove the lower nuts on both the engine and torque
converter sides for easy positioning at the time of
reinstallation on the vehicle.
terminal.
Weight
Center of gravity
Above the con-
Approx.
tact surface
1,200 kg
between the
(2645 lb)
engine and
torque converter
1-27

Hide quick links:

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

50-4fd11550-4fd12050-4fd13550-4fdk15050-4fdk160

Table of Contents