Download Print this page

Daikin RK20GV1B Service Manual page 12

2.0/2.5/3.0/3.5 kw class

Advertisement

Removal of Electrical Box / PCBs
Step
9
Lift and remove the
electrical box.
3. Remove the main PCB.
Remove the screw on
1
the terminal board.
Cut the clamp.
2
3
Remove the 2 screws
of the earth / ground
wires.
4
Disconnect the 2
terminals of the reactor.
10
Procedure
Electrical box
Clamp
White
Brown
Reactor
(R11236)
1: black, upper
2: white, lower
3: red, upper
(
) : green / yellow, lower
Terminal board
Main PCB
(R18222)
(R15867)
(R18751)
Si00-874
Points
Removal Procedure

Hide quick links:

Advertisement

loading