Engine Installation; Lifelines, Pulpits And Stanchions; Spars And Standing Rigging (Pre-Stepped) - Tayana 37 Operation & Maintenance Manual

Table of Contents

Advertisement

ENGINE INSTALLATION

All mounting bolts tight
Engine aligned to .002 max. clearance
Coupling bolts tight
Shaft set screw tight and secured with safety wire
Crankcase oil level full
Transmission gear box oil level full
Throttle/shift linkage secure
Engine stop connection secure
Drain plugs installed and petcocks closed
.

LIFELINES, PULPITS AND STANCHIONS

Pulpits and stanchions secure
Lifelines properly tensioned
Lifeline end fittings safety-wired
Gates function properly
Lifeline wires free of physical damage

SPARS AND STANDING RIGGING (Pre-Stepped)

Mast free of physical damage
Rigging free of physical damage
Mast wiring and lights functional
Masthead pins secured
Spreaders fit and properly secured
Standing rigging and topping lift _ properly fastened to
spar and pinned
All fasteners tight
Halyards installed
YES
NO
YES
NO
YES
NO
CORRECTED
CORRECTED
CORRECTED
III-6

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents