Download Print this page

Nice Peccinin Safety And Installation Instructions Manual page 17

Electromagnetic lock for automatic gates

Advertisement

Available languages

Available languages

6 - SHEET
METAL BASE
5 - SCREWS TO FIX THE
SHEET METAL BASE ON
THE STRUCTURE
• Verify how the power wires will reach the location set
for the lock installation and leave ready for installation
of the product.
• Position the fixing base(6) and fix it in the desired way, it
can be fixed by welding or screws(5) that accompany the
kit. If the local for installing does not have enough space
, you can use the adapter sheet metal (4.)
• Connect the electronic control unit wires
4 - ADAPTER SHEET METAL
BASE
Electromagnetic lock for automatic gates
1- UNLOCKING MANUALLY
2- RAMP/ PIN GUIDE
3 - SCREWS TO FIX THE
LOCK BODY INTO THE
SHEET METAL BASE
17

Advertisement

loading