This test may be performed with the aircraft in flight or on the ground, as long
as it is running at high RPM with all systems powered.
An offending interference source can be isolated by shutting down one system at a time, then clearing
the display and observing the noise monitor screen. Refer to troubleshooting electrical noise,
paragraph, 4.6.
17. This completes the post installation checkout procedure.
3-8
Rev. C
WX-950
Installation Manual
NOTE
Need help?
Do you have a question about the Stormscope Series II and is the answer not in the manual?