Download Print this page

Wieland wienet IOТ SK DIO8-3G-W Quick Start Manual page 3

Iot-gateway starter kit

Advertisement

Available languages

Available languages

Installation instructions (translation from original)
wienet IoT Gateway Starter kit
IOT SK 100-DIO8-3G-W
1
Personnel which installs, programs, operates or maintains this device must have read and
understood these instructions.
The personnel must be thoroughly familiar with all warnings, notes and procedures de-
scribed in these operating instructions.
Where necessary, safety precautions and safety devices must comply with the applicable
regulations.
Damaged products must neither be installed nor put into operation.
The unit must not be opened.
Do not insert any objects into the unit!
Keep away from fire and water!
1 Function description
The wienet IOT GW 100-DIO8-3G-W devices communicate with the wienetCloud via UMTS
modem or Ethernet. The communication mechanism has a low data volume and can be in-
tegrated easily in existing network infrastructures.
The IoT gateway is designed for an installation on a grounded 35 mm DIN rail in dry rooms.
The power supply of the device must be a grounded circuit PELV (connection between func-
tional earth and ground). The power supply must be a limited power source according to
the EN60950-1 chap. 2.5 or must be provided with an anti-surge fuse of 2 A.
2 Functional elements and indicators (fig. 2)
Pin assignments and connections
Power supply (fig. 2, j)
FE
GND
Functional earth
Ground
COM (fig. 2, k)
Pin
1
2
RS232
COM_GND CTS
RS485
COM_GND
CAN (fig. 2, l)
Pin
Description
CAN_HIGH
Digital I/Os
Signal
Description
+
24 VDC
I 0
Digital input 0
I 1
Digital input 1
I 2
Digital input 2
I 3
Digital input 3
LEDs
Status LEDs (fig. 2, i)
LED
Description
PLC
PLC status
Portal
Portal status
GSM
Modem status
LED 4
Freely programmable
Power
Device is powered
Ethernet interface (ETH; fig. 2, f)
LED
Description
Green LED
Link indication
Yellow LED
Activity indication
Network status (fig. 2, d)
LED state
Description
Off
Offline or not active
Green
Online (RUN)
Green, 1 flash
Online (STOP)
Green, blinking
Blink
Red
Fatal event
Red, 1 flash
Station name error
Red, 2 flashes
IP address error
Red, 3 flashes
Configuration error
3 Access to the web interface for the IoT gateway
The IoT gateway is configured via a web interface using a web browser. Open the following
URL in the browser and enter the login data:
Address: http://192.168.1.10
User name: admin
The web interface then opens. If the window does not open, please check the proxy settings
for the browser you are using. Please do not use a proxy!
Doc. # BA001202 – 11/2020 (Rev. B)
83.041.1011.0
2
e
f
g
h
i
j
k
l
NOT E
W A R N IN G
VCC
24 VDC
3
4
5
6
Tx
RTS
B (+/Z)
A (-/Y)
TERM_120
1
2
3
TERM_120
CAN_LOW
Signal
Description
Q 0
Digital output 0
Q 1
Digital output 1
Q 2
Digital output 2
Q 3
Digital output 3
-
Ground
Module status (fig. 2, c)
LED state
Description
Off
Not initialized
Green
Normal operation
Green, 1 flash
Diagnostic event(s)
Red
Exceptional error or
fatal event
Alternating
Firmware update
Red/Green
Password: wienet123
Wieland Electric GmbH
Brennerstraße 10 – 14
96052 Bamberg
Phone +49 951 9324-0
Fax
+49 951 9324-198
info@wieland-electric.com
www.wieland-electric.com
3
a
b
c
d
3 Installation
Inserting the SIM card
Never use the device in areas where the operation of wireless equipment is prohibited.
When choosing a place to install the antenna, ensure the compliance with radiation lim-
its (20 cm min. distance from persons or other antennas).
Adhere to the lightning protection standard VDE V 0185 when installing the antenna out-
side. The antenna and its connection cable have to comply with the E.M.C. lightning
zone concept.
The device must be deactivated while working with the antenna.
Before installing the IoT gateway on the DIN rail and turning it on, insert the SIM card at the
rear side of the device (see fig. 3).
Mounting on support rail (see fig. 4)
1. Tilt the unit slightly backwards.
2. Fit the unit over top hat rail.
3. Push the unit downwards and against the rail for locking.
4. Check that the unit is locked into position.
Connecting to power
Prepare a suitable power source and connect it to the wienet IoT gateway.
Connecting to network device via ethernet
Connect your device by standard UTP/STP cable with RJ45 connectors to the wienet IoT
gateway.
4 Load factory settings (reset)
1. Disconnect the IoT gateway from the power supply.
2. Press the reset button (fig. 2, g) with a pointed object (e.g. a paper clip) and keep it
pressed (until step 5).
3. Connect the IoT gateway to the power supply.
4. Wait until the IoT gateway confirms the reset by two short flashes of all LEDs.
7
8
5. Release the reset button and wait until the IoT gateway finished the restart. Do not dis-
Rx
connect the device from the power supply during the restart.
5 Removal from DIN rail (fig. 5)
4
CAN_GND
Switch mains power off and disconnect your system from the supply network.
Push down the power supply, and tilt upwards.
6 Technical data
Power supply
Supply voltage
Active current
Interfaces
SD card interface, fig. 2, h
USB interface, fig. 2, e
Antenna interface, fig. 2, a
SIM card interface, fig. 3
Connectors
Wiring
Connector cross-section
Stripping length
General data
Operating temperature
Storage temperature
Dimensions
Degree of protection
EMC emission / immunity
UMTS
Max. RF transmitted power:
CE: Hereby, Wieland Electric GmbH declares that the wienet IOT SK 100-DIO8-3G-W is in
compliance with the following European directives:
RED directive 2014/53/EU, RoHS directive 2011/65/EU.
The complete EU Declaration of Conformity is available with the respective part number
under e.g.
https://eshop.wieland-electric.com/products/83.041.1011.0
"Downloads".
7 Scope of delivery
1 GW 100-DIO8-3G-W
1 Installation instructions
1 label MAC address
wienet IOT SK 100-DIO8-3G-W
4
NOT E
W A R N IN G
24 VDC (±15%)
<140 mA
microSD card
Micro USB (OTG Host & Slave)
SMA connector (female)
Mini-SIM (2FF)
Screw: 3-/10-pin; Push-in: 4-/8-pin
3-/10-pin: 0.2...1.5 mm² (AWG 28 – AWG 14)
4-/8-pin: 0.2...1 mm² (AWG 28 – AWG 14)
3-/10-pin: 7 – 8 mm; 4-/8-pin: 7 mm
0...+55 °C
-20...+60 °C
see dimensional drawing, fig. 1
IP20
IEC 61000-6-3 / IEC 61000-6-2
E-GSM/GPRS 900: 33.5dBM; EDGE 900: 28 dBm
DCS/GPRS 1800: 30.5 dBm; EDGE 1800: 27 dBm
WCDMA FDD/HSPA I/VIII: 24 dBm
1 LAN cable
1 plug-in power supply 230 V + cable
1 microSD card
1 electronic input simulator with
1 UMTS antenna
plug-in terminal (3-/-10 pin)
5
in the register
EN

Advertisement

loading

This manual is also suitable for:

83.041.1011.0