S e c t i o n P a g e Congratulations on your purchase of the MARQ Series Paintball Marker. The MARQ represents the latest Safety ................2 in Paintball Marker technology at an affordable price.
I N T R O D U C T I O N !WARNING! Always ensure Marker is not shooting at a dangerous velocity. Ensure all participants are wearing the proper Paintball The MARQ Series Paintball Marker is controlled via the single-button rubber on/off membrane located on the rear of the Trigger Frame.
INTRODUCTION OPERATION - GAS CONFIGURATIONS [continued] Preset and Adjustable Tanks REGULATORS A Compressed Air System also known as a Nitrogen Air System is the recommended propellant air source for Included with the MARQ are 2 High-Flow Regulators. Both regulators use a standard 1/8 inch hex key for adjustment. operating the MARQ.
ELECTRONICS Light Emitting Diode The MARQ Series Marker features a Multi-Color LED that indicates the operational Status of the Marker. Once Battery Information powered up, the LED on the rear of the Trigger Frame will flash Green, indicating the Marker is ready for operation. Depending on the particular Eye System of your MARQ, the LED will flash a certain color once paintballs are The MARQ uses a standard 9v battery.
1.FIRING ENGINE & ASSEMBLY DISASSEMBLY DISASSEMBLY GETTING STARTED The Firing Engine can be accessed by When disassembling the MARQ, always ensure the Marker is degassed. removing the retaining screw located The DISASSEMBLY portion of this manual will be divided into four sections. on the bottom of the rear plate figure 1 and using the Allen Key,...
Page 7
1.FIRING ENGINE FIRING ENGINE PARTS CHECKLIST DISASSEMBLY 1. Firing Engine Retaining Screw continued 2. Firing Engine Back Block 3. Ram Adjuster 7. with the bolt removed, the rest of the firing engine can be disassembled 4. Ram Adjuster O - ring 8.
Page 8
7. lift out board and carefully remove 2.TRIGGER FRAME from frame DISASSEMBLY 8. unscrew FRONT trigger frame retaining screw until there is a slight gap between the body and frame - see HOT TIPS below 1. remove high - pressure regulator 9.
Page 9
TRIGGER FRAME PARTS CHECKLIST 1. Grip Panel Retaining Screws 2. Left Side Grip Panel 3. Right Side Grip Panel 4. Board Mounting Screw 5. MARQ Series LED Board - Version 1.0 6. Trigger Spring Bracket Mounting Screws 7. Trigger Spring Bracket 8.
7. disconnect hose from solenoid manifold 3.BODY DISASSEMBLY 8. disconnect solenoid from wiring harness 9. remove solenoid manifold retaining screws 1. remove eye cover retaining screws and remove solenoid from body and remove covers 1 on each side 10. remove LPR retaining screws and remove 2.
Page 11
BODY ASSEMBLY PARTS CHECKLIST 1. Main Marker Body 2. Feedneck Collar 3. Feedneck Wedge Adjustment Screw 4. Feedneck Wedge 5. Eye Cover Retaining Screw x2 - one per side 6. Left Side Eye Cover 7. Right Side Eye Cover 8. PCB Retaining Screw x2 - one per side 9.
Page 12
LOW - PRESSURE REGULATOR 4.REGULATOR 8. remove brass pressure adjuster from DISASSEMBLY regulator body 9. remove lpr main spring HIGH - PRESSURE REGULATOR 10. remove regulator piston 1. separate regulator halves 11. remove air valve from regulator body 2. loosen asa swivel adapter 12.
Page 13
REGULATOR PARTS CHECKLIST LOW-PRESSURE REGULATOR 360 IINLINE REGULATOR 1. LPR Brass Pressure Adjuster 1. ASA Swivel Adapter 2. LPR Main Spring 2. ASA Swivel Adapter Retaining Screws 3. LPR Piston 3. 360 Upper Regulator Housing 4. LPR Main Valve 4. Main Valve 5.
Need help?
Do you have a question about the MARQUEE Series and is the answer not in the manual?
Questions and answers