Installation - Existing Construction without above or
Step 4: Removing the motor and power line
3
Step 5: Removing the duct connector flange
1
Step 6: Removing the junction box
2
attic access
1
2
A
1
• Loosen the three screws where indicated
by the arrows.
• Unlatch the metal clip (1), disconnect
power clip (2) and remove from the
motor (3) from the housing (A).
• Loosen and remove the one screw from the
housing (A) and remove the duct connector
flange (1).
• Remove the junction box (1) from the
housing (A) by loosening and removing
the screw (2).
11
Need help?
Do you have a question about the B089R8S365 and is the answer not in the manual?
Questions and answers