Break-In Procedure - Nakanishi BMS-4040-RGD-03M Operation Manual

Motor spindle
Table of Contents

Advertisement

11 . BREAK-IN PROCEDURE

During transportation, storage or installation the grease inside the bearings will settle. If the spindle is suddenly run
at high-speed excessive heat will cause bearing damage. After installation, repair, initial operation, or long periods
of non operation please follow the break-in procedure detailed in Table 2.
Table 2 .
Steps
Rotation speed ( min
- 1
Rotation Time (min)
Items to Check
12 . CAUTIONS IN USING GRINDSTONES AND TOOLS
CAUTION
The maximum surface speed or rpm is always specified for a grindstone. Do not exceed the
maximum speed with reference to the calculating chart below. Always follow the grindstone
manufacturers recommendations.
Surface Speed ( m/s ) =
① The proper surface speed for general grindstones is 10 -30m/s.
② Do not exceed 13mm of overhang for mounted grindstones as shown in Fig. 20. If the overhang must
exceed 13mm, reduce the motor speed in accordance with table 3.
③ Do not use tools with bent or broken shanks, cracks or excessive run-out.
④ Dress the grindstone prior to use.
⑤ For grinding, the maximum depth of cut should not exceed 0.01mm radially or axially. Reciprocate the tool
several times after each pass to eliminate tool pressure.
⑥ Always operate tools within the allowable recommended speed of the tools. Use of a tool outside of the
allowable speed of the tools could cause damage to the spindle and injury to the operator.
⑦ Keep the tool shank and collet clean. If contaminants are left in the collet or collet nut, excessive run-out will
cause damage to the tool and or spindle.
⑧ Do not strike or disassemble the spindle.
⑨ Please set the tools to minimize the overhang amount. 13mm is the maximum amount of overhang to
maintain high accuracy and safety.
1
10,000
15
No Abnormal
The motor spindle housing temperature
Noises
during the break-in process should not
exceed 25 degrees C (36 degrees F) above
ambient temperature. Should the motor
spindle exceed this limit, rest the motor
spindle for at least 20 minutes and re-start
the break in procedure from the beginning.
If the housing temperature rises again and
exceeds 25 degrees C (36 degrees F) above
ambient temperature, check the motor
spindle for proper installation.
3.14 x Diameter ( mm ) x rotation speed ( min
2
20,000
10
1,000 x 60
3
30,000
10
T h e m o t o r s p i n d l e
housing temperature
during the break-in
process should not
exceed 25 degrees C
(36 degrees F) above
ambient temperature.
)
-1
4
40,000
15
9

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bms-4040-rgd-2m bms-4040ra-rgd-03mBms-4040ra-rgd-2m

Table of Contents