ELETTRO CF s.r.l.
3 - MAINTENANCE
ANY INTERNAL INSPECTIONS OR REPAIRS MUST BE CARRIED OUT BY
BEFORE BEGINNING MAINTENANCE OPERATIONS, UNPLUG THE POWER
SOURCE FROM THE MAINS AND WAIT FOR THE INTERNAL CAPACITORS TO
3.1 - Periodic inspection, cleaning.
Periodically open the power source grids and check inside the aeration tunnel.
Remove any dirt or dust to ensure smooth air flow, and thus adequate cooling of the
internal parts of the power source.
Check the condition of the output terminals, output and power supply cables of the
power source; replace if damaged.
Check the condition of the internal power connections and connectors on the electronic
boards; if you find "loose" connections, tighten or replace the connectors.
3.2 - Operating sequence (pict. 3.2.1).
The following sequence represents correct functioning of the machine. It may be used
as a guiding procedure for troubleshooting.
It must be carried out after each repair without any errors.
3.2.1 - Power source commands and signals.
WARNINGS
QUALIFIED PERSONNEL.
DISCHARGE (1 MINUTE).
5
01/11/16