Approved Installation Manual for the Experimental
EDM-350
Advisory Engine Data Management System
Section
Revisions ______________________________________________________________________________________ 2
1.
2.
Read This First _________________________________________________________________________________ 2
3.
4.
5.
6.
7.
8.
Power Connection ______________________________________________________________________________ 11
9.
Probe Wiring __________________________________________________________________________________ 11
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
GPS Interface _________________________________________________________________________________ 24
22.
23.
24.
25.
26.
Component Parts _______________________________________________________________________________ 29
27.
28.
Pilot Programming _____________________________________________________________________________ 31
29.
30.
Programming the MAP __________________________________________________________________________ 34
31.
32.
33.
K Factor ______________________________________________________________________________________ 35
34.
35.
36.
37.
Trouble Shooting _______________________________________________________________________________ 38
38.
43.
44.
J3 RPM, MP, Oil-P _____________________________________________________________________________ 43
Appendix A Connector Pin Assignments on EDM, J1-J2 Only with ARINC 429 _______ Error! Bookmark not defined.
45.
46.
Appendix B ICA _________________________________________________________ Error! Bookmark not defined.
The Owner of the EDM-350 must keep this manual
TABLE OF CONTENTS
J.P. INSTRUMENTS
PO BOX 7033
HUNTINGTON BEACH CA
Report No 104
Page 1 of 46 Rev A
Date 7-10-2021
Page
Last printed 7/19/2021 4:28:00 PM