Fuse Holder And Fuse - Bunn CDBC-DV Operating & Service Manual

Bunn cdbc-dv: user guide
Table of Contents

Advertisement

SERVICE (cont.)
FUSE HOLDER/FUSE ASSEMBLY
TR
M1
TR
M2
FIG. 15 FUSE HOLDER AND FUSE ASSEMBLY
Location:
The fuse holder and fuse assembly is located on
the left rear side of the brewer.
Test Procedures:
1. Disconnect the brewer from the power source.
2. Remove the cap from the fuse holder and remove
the fuse.
3. With an ohmmeter, check for continuity through
the fuse.
If continuity is present as described, reinstall the fuse,
the fuse is operating properly.
If continuity is not present as described, replace the
fuse.
MV models only
P1937
Page 32
Removal and Replacement:
1. Remove the cap from the holder.
2. Remove fuse from the fuse holder and discard.
3. Install new 20 amp fuse in the holder.
4. Reinstall fuse holder cap.
29707 112801

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents