Maga MA-N28 Manual For Operation And Installation

Maga MA-N28 Manual For Operation And Installation

Wood-gasification boiler

Advertisement

Quick Links

MANUAL FOR INSTALATION AND OPERATION OF
Wood-gasification boiler MA-N28, MA-N38
Dear customer, thank you for the purchasing of our product. Please, follow the manual
in order to be 100% satisfied with its operation and maintenance.
Manual
Version 2021/ 1.1
MAGA s.r.o., Samuela Kollára 86, 979 01 Čerenčany, SLOVAKIA
Mob.: +421 917 465 298 | Tel:+421 475 634 798 | e-mail:
SLOVAKIAN WOOD and PELLET BOILER
MANUFACTURER
sales@magasro.sk
Team MAGA
|
www.magasro.sk

Advertisement

Table of Contents
loading

Summary of Contents for Maga MA-N28

  • Page 1 100% satisfied with its operation and maintenance. Team MAGA Manual Version 2021/ 1.1 MAGA s.r.o., Samuela Kollára 86, 979 01 Čerenčany, SLOVAKIA Mob.: +421 917 465 298 | Tel:+421 475 634 798 | e-mail: sales@magasro.sk www.magasro.sk...
  • Page 2: Table Of Contents

    MAGA s.r.o., S. Kollára 86, Čerenčany 979 01, Slovak Republic. Made in Slovakia +421 917 465 298, servis@magasro.sk,www.magasro.sk CONTENT CONTENT..............................2 INTRODUCTION ............................3 GENERAL ............................... 3 IMPORTANT INFORMATION ......................... 4 FUEL ..............................8 ASSEMBLING AND INSTALLATION ......................9 MANIPULATION ..........................9 REGULATIONS AND DIRECTIVES ....................
  • Page 3: Introduction

    Thank you for the trust you have shown by the purchasing of our product, Wood- gasification boiler MA-N28/38. We wish you a long and reliable boiler service. One of the prerequisites for reliable and correct function is its correct operation and therefore it is necessary to read these operating instructions carefully.
  • Page 4: Important Information

    20 - 30%, longer life of the boiler and chimney and more comfortable operation. • We recommend connecting the boiler together with the accumulation tank, the volume of which should be at least 70 l per 1 kW of boiler output (ie min. 2000 l for type MA-N28 or 2700 l for MA-N38) •...
  • Page 5 MAGA s.r.o., S. Kollára 86, Čerenčany 979 01, Slovak Republic. Made in Slovakia +421 917 465 298, servis@magasro.sk,www.magasro.sk WARNING: The boiler may only be used for the purpose for which it is intended and only as described in this manual.
  • Page 6 MAGA s.r.o., S. Kollára 86, Čerenčany 979 01, Slovak Republic. Made in Slovakia +421 917 465 298, servis@magasro.sk,www.magasro.sk The boiler is not covered by the warranty if: • is not operated with the prescribed fuel, • the Laddomat 21-60, 21-100 or MAGAMAT 60 ° C mixing device will not be installed in the system, which ensures a return water temperature to the boiler of at least 60 °...
  • Page 7 MAGA s.r.o., S. Kollára 86, Čerenčany 979 01, Slovak Republic. Made in Slovakia +421 917 465 298, servis@magasro.sk,www.magasro.sk Power (nominal) Fuel consumption kg/h 7,24 9,21 Flue draft required Flue output diameter Flue gas mass flow Qmax 15,916 24,861 Connection G 6/4"...
  • Page 8: Fuel

    3. FUEL Recommended fuel for the MA-N28 / 38 boiler is soft and hard chopped firewood with a calorific value in the range of 15 to 17 MJ / kg. The most suitable wood is especially beech, oak, fir, spruce, pine, poplar, alder, willow, birch, ash, hornbeam, agate with a humidity in the range of 12 to 20%.
  • Page 9: Assembling And Installation

    MAGA s.r.o., S. Kollára 86, Čerenčany 979 01, Slovak Republic. Made in Slovakia +421 917 465 298, servis@magasro.sk,www.magasro.sk 4 ASSEMBLING AND INSTALLATION The boiler may only be installed by a person with a valid authorization for the installation and assembly of heating equipment. A project that complies with the applicable regulations must be prepared for the installation.
  • Page 10: Regulations And Directives

    MAGA s.r.o., S. Kollára 86, Čerenčany 979 01, Slovak Republic. Made in Slovakia +421 917 465 298, servis@magasro.sk,www.magasro.sk REGULATIONS AND DIRECTIVES The heating system must be filled with water that meets the requirements of STN 07 7401: 1992 and its hardness must not exceed the required parameters.
  • Page 11: Placement

    MAGA s.r.o., S. Kollára 86, Čerenčany 979 01, Slovak Republic. Made in Slovakia +421 917 465 298, servis@magasro.sk,www.magasro.sk PLACEMENT In addition to the above, the boiler room must meet the following conditions: • There must be no potentially explosive atmosphere in the boiler room, as the boiler is not suitable for use in such environments.
  • Page 12 MAGA s.r.o., S. Kollára 86, Čerenčany 979 01, Slovak Republic. Made in Slovakia +421 917 465 298, servis@magasro.sk,www.magasro.sk Tab.1 Degrees of flammability of building materials and products Degree of flammability of Building materials and products classified into flammability building materials and...
  • Page 13: Fume Outlet From The Boiler

    MAGA s.r.o., S. Kollára 86, Čerenčany 979 01, Slovak Republic. Made in Slovakia +421 917 465 298, servis@magasro.sk,www.magasro.sk Fuel placement: • dry fuel must be used for proper combustion in the boiler. • it is forbidden to store fuel behind the boiler, store it next to the boiler at a distance of less than 400 mm.
  • Page 14: Method Of Connection Of Controls And Safety Elements

    MAGA s.r.o., S. Kollára 86, Čerenčany 979 01, Slovak Republic. Made in Slovakia +421 917 465 298, servis@magasro.sk,www.magasro.sk The exact size of the chimney is determined by STN 73 42 10. The prescribed draft of the chimney is given in the Technical parameters. If your chimney does not reach the prescribed chimney parameters, it is possible to install an additional MAX FAN 160 fan behind the boiler, which can create the required chimney parameters.
  • Page 15 MAGA s.r.o., S. Kollára 86, Čerenčany 979 01, Slovak Republic. Made in Slovakia +421 917 465 298, servis@magasro.sk,www.magasro.sk 1- boiler 2- Laddomat 3- Safety group 4- expansion vessel 5- accumulation tank 6- mixing group...
  • Page 16: Boiler Use

    MAGA s.r.o., S. Kollára 86, Čerenčany 979 01, Slovak Republic. Made in Slovakia +421 917 465 298, servis@magasro.sk,www.magasro.sk 5 BOILER USE 5.1 PREPARING THE BOILER FOR OPERATION Before the start of the boiler operation, make sure that the system is filled with water, vented and that the heating water pressure does not drop.
  • Page 17: Operation

    MAGA s.r.o., S. Kollára 86, Čerenčany 979 01, Slovak Republic. Made in Slovakia +421 917 465 298, servis@magasro.sk,www.magasro.sk 1. Open the loading door. Check the height of the ash in the loading chamber. If the height of the ash exceeds 50 mm from the bottom of the chamber, clean the loading chamber. If there are wooden carbons in the chamber, it is not necessary to remove them, they will facilitate heating.
  • Page 18: Boiler Cleaning

    MAGA s.r.o., S. Kollára 86, Čerenčany 979 01, Slovak Republic. Made in Slovakia +421 917 465 298, servis@magasro.sk,www.magasro.sk wood is almost completely consumed and only carbon remains in the loading chamber. We do not recommend replenishing wood during normal operation, when there is more than 20% of...
  • Page 19 MAGA s.r.o., S. Kollára 86, Čerenčany 979 01, Slovak Republic. Made in Slovakia +421 917 465 298, servis@magasro.sk,www.magasro.sk deposited in the loading or combustion chamber together with condensates and tar significantly reduces the life, performance and efficiency of the boiler. With a larger amount of ash, there is not enough space to burn the fuel and the ceramic nozzle holder and thus the entire boiler can be damaged.
  • Page 20: Possible Malfunction Reasons

    MAGA s.r.o., S. Kollára 86, Čerenčany 979 01, Slovak Republic. Made in Slovakia +421 917 465 298, servis@magasro.sk,www.magasro.sk 6 POSSIBLE MALFUNCTION REASONS MALFUNCTION REASON SOLUTION Display does not work No voltage Check Improperly plugged in Check Damaged cable Exchange the cable...
  • Page 21: Warranty And Guarantee

    MAGA s.r.o., S. Kollára 86, Čerenčany 979 01, Slovak Republic. Made in Slovakia +421 917 465 298, servis@magasro.sk,www.magasro.sk 7 WARRANTY AND GUARANTEE Warranty and after-warranty reparations are made by Manufacturer: MAGA s.r.o. S. Kollára 86 979 01 Čerenčany Slovak Republic...
  • Page 22: Letter Of Guarantee

    MAGA s.r.o., S. Kollára 86, Čerenčany 979 01, Slovak Republic. Made in Slovakia +421 917 465 298, servis@magasro.sk,www.magasro.sk LETTER OF GUARANTEE This letter of guarantee substitutes certificate of quality and integrity of the product. Producer confirms that the boiler meets requirements of demanded quality, is complete in an extent specified by documentation and is in accordance with EN 303-5: 2012.
  • Page 23: Warranty And Guarantee Conditions

    MAGA s.r.o., S. Kollára 86, Čerenčany 979 01, Slovak Republic. Made in Slovakia +421 917 465 298, servis@magasro.sk,www.magasro.sk WARRANTY AND GUARANTEE CONDITIONS 1) The claim for completeness of delivery is applied in accordance with the Commercial and Civil Code at the suppliers country.
  • Page 24 In case of interference with the boiler electrical parts other than a service technician, or by professionally trained workers, the warranty expires. All the products manufactured by MAGA, s.r.o. are certified according to valid standards and regulations. Technic and design modifications of the products are reserved. Company...
  • Page 25: Record Of Guarantee Repairs

    MAGA s.r.o., S. Kollára 86, Čerenčany 979 01, Slovak Republic. Made in Slovakia +421 917 465 298, servis@magasro.sk,www.magasro.sk RECORD OF GUARANTEE REPAIRS Record of performed repairs within and after guarantee period Date of the Performed activity Organization Signature of the...
  • Page 26 MAGA s.r.o., S. Kollára 86, Čerenčany 979 01, Slovak Republic. Made in Slovakia +421 917 465 298, servis@magasro.sk,www.magasro.sk...

This manual is also suitable for:

Ma-n38

Table of Contents