Download Print this page

Feit Electric PN/BLK Manual page 2

Led pendant fixture

Advertisement

Available languages

Available languages

WARNING: TURN OFF THE MAIN POWER AT THE CIRCUIT BREAKER BEFORE
INSTALLING THE FIXTURE IN ORDER TO PREVENT POSSIBLE ELECTRIC SHOCK.
Prepare cross bar
1
Attach and tighten fixture mounting screws
(4) to cross bar using mounting screw nuts
(3). Make sure fixture mounting screws line
up with holes on canopy (9).
.25 in
2
3
FEIT ELECTRIC COMPANY | PICO RIVERA, CA | (800) 543-3348 | FAX (562) 908-6360 | www.feit.com
MOUNTING INSTRUCTIONS
NOTE: Position cross bar to junction box
to determine the adjustment length of
screw based on junction box being level
(recessed or sticking out from ceiling).
Momentarily place canopy over cross bar
and make sure screws are protruding
0.25 inches from canopy.
Connect wires
4
Lift fixture canopy (9) to junction box.
Using wire nuts provided connect both
ground wires (8 and 8a) from fixture to
junction box green or bare copper ground
wire. Connect white fixture wire(s) to
neutral supply wire. Connect black fixture
wire(s) to power supply wire.
Install canopy
5
Insert fixture mounting screws (4) through
holes on the canopy and secure to cross
bar by tightening finials (11). NOTE: Hand
tighten finials. Do not use any tools as
over tightening may occur causing
damage to canopy.
Save these instructions

Advertisement

loading