Turning The Battery On / Off; Charging The Battery - Horizon Fitness HILLTOPPER Installation Manual

Electric bike kit
Table of Contents

Advertisement

TURNING THE BATTERY ON / OFF:

Press the red POWER SWITCH on the side of the BATTERY
to turn the BATTERY on or off.
You can find the switch under the rubber cover on the side
CAUTION: Make sure to turn the BATTERY off when not in
use to avoid accidental throttle engagement and battery drain.

CHARGING THE BATTERY:

NOTE: Charge plug is found under the rubber cover with the
power switch
A. Plug your charger into the wall socket and wait for the
light to turn GREEN.
B. Plug the charger into the battery. The charger light will turn
RED and stay RED while charging.
C. When the charger light turns GREEN your battery is fully charged.
NOTE: Charger will take 6 hours to recharge depleted battery
INSTALLING THE VARIABLE SPEED THROTTLE
We recommend putting the VARIABLE SPEED THROTTLE on the LEFT. Placing them between the handlebar grip and the brake/shifter levers.
NOTE: You may set up your placement differently depending on your preference and bike set up.
STEP 1: Remove handlebar grips.
NOTE: Some grips have locking bolts on the end of the handlebar. If resistance is too great, you can heat the grip with a hair-dryer.
Grips may be cut off of the bar, but will need to be replaced.
NOTE: If you wish to install your VARIABLE SPEED THROTTLE on the inside (closer to the stem) of the brake/shifter lever you
will need to slide the brake/shifter level off the handlebars
Loosen brake/shifter and slide off of handlebar.
Usually there is only one bolt for each located on the backside or underside of the handlebar.
Cables do not need to be disengaged to remove the brake or shifter levers.
STEP 2: Slide VARIABLE SPEED THROTTLE onto the handlebars
STEP 3: Partially tighten the provided bolt on the underside of the clamp with a 3mm hex wrench.
NOTE: Keep it a little loose untill grips are replaced for ajustability.
STEP 4: Slide grips back into place remembering to lock them if they have locking bolts.
NOTE: If you have removed the brake / shifter lever make sure to slide those on before the grips.
STEP 5: After everything is in place and where you want it TIGHTEN each part to avoid any movement once the bike is in use
VARIABLE SPEED THROTTLE
POWER SWITCH
USB PORT
CHARGING PORT

Advertisement

Table of Contents
loading

Table of Contents