4 - OPERATING INSTRUCTIONS
Top link adjustment
The top link mounting bracket (1) has two holes for at-
taching the three-point hitch top link. Attach the top link
using the lower hole for light draft loads, such as mowers.
Attach the top link to the top hole for heavier draft loads,
such as ground engaging equipment.
1
NHIL12CT00806AA
4-9