Inspection - Lochinvar Thermal-Stor 100 Series Installation And Operation Manual

Heat pump storage tank
Table of Contents

Advertisement

4

Inspection

The following table summarizes the recommended time intervals for inspections of the tank, components, water piping and
power connections.
To Be Inspected
Circulating Pump
Gauges - Pressure &
Temperature
Lines - Inlet, Outlet, &
Return
Pressure Relief Valve
Shutoff Valves - Manual
Temperatures - Water &
Operating
Thermometer
Magnesium Anode Rods
Interior for Sediment or Scale
Flush tank at six (6) month
intervals
RECOMMENDED INSPECTIONS
Per
Manufacturer
Weekly
Specs
Storage Tank Installation and Operation Manual
Time Interval
Monthly
Quarterly
Annually
9

Advertisement

Table of Contents
loading

Table of Contents