Instructions for mounting casters to platform models WP-3636, -3648, & -4848
Improperly installed, utilized, or maintained casters could make the platform unsafe to use. To reduce
the likelihood of serious injury:
 READ EACH INSTRUCTION BEFORE BEGINNING THE INSTALLATION.
 Inspect the casters regularly for damage and to verify that the caster stem is still inserted fully and that it is securely
held inside the post.
 Only use the casters on flat, even, solid surfaces.
 DO NOT move the platform when loaded with equipment or personnel. Only move the platform by means of the
casters if completely unloaded AND unoccupied.
 Forklift operator: DO NOT lower the platform onto the casters at a rate greater than one foot per second. Gently
lower the platform onto the casters to avoid damaging them.
1. Verify that the bottoms of all four of the handrail posts are undamaged and free of foreign material (inside the
posts).
2. Raise the work platform high enough to allow the casters to be inserted into the bottom of each of the four posts.
3. Examine each caster; verify that each has a plastic spacer, a black rubber expansion sleeve, and a knurled nut as
shown in Figure A.
4. Hold onto the 2½" tightening hub at the top of the caster rig with your hand and snug the knurled nut against the top
rubber expansion sleeve.
5. Insert the caster stem into the bottom of the post until the tightening hub is up against the bottom of the handrail
post.
6. Turn the tightening hub counterclockwise. If the hub doesn't tighten, apply side pressure to the caster while turning
the hub. Note: The tightening hub must maintain contact
with the bottom of the corner handrail post during tightening.
7. After hand-tightening the hub, pull down on the caster rig to
verify that the caster is secured in the post.
Work platform with casters installed
5/9/2011
Handrail
post
12 of 14
Copyright 2010 Vestil Manufacturing Corp.
WP manual, operation instructions.doc
FIG. 7: Caster insertion
Corner handrail
post
Caster stem
Knurled nut
Expansion
rubber
Plastic spacer
Tightening hub
Caster rig
Insert caster
into corner
post; bottom of
post should
rest on
tightening hub