Assembly And Commissioning Instructions - Sunrise Medical Oxford STOWAWAY 140 User Instruction Manual

Range of mobile hoists
Table of Contents

Advertisement

O x f o r d R a n g e o f M o b i l e H o i s t s
Assembly and Commissioning Instructions
Place the carton in a clear working area and open carefully. The carton contains:-
Main Wheeled Chassis
Mast and Boom Assembly
Leg Adjusting Handle
Wallet Containing Documents
Handcontol (electric only)
Battery Charger (electric only)
Battery Pack
1. Remove all the parts from the carton and place on the floor, taking care to protect the
finish from damage.
SAFETY NOTE: Some of the parts are heavy and will need to be lifted with care. You
may need assistance with the heavier assemblies.
2. Apply the brakes on the rear castors of the chassis.
3. Fit the mast assembly to the chassis. The mast is located into the rectangular socket on
the top centre of the chassis.
SAFETY NOTE: Avoid trapping fingers. Keep fingers away from the end of the mast
when inserting into the socket.
4. When the mast is fully engaged with the socket, turn the mast locking knob clockwise
until fully tightened.
SAFETY NOTE: Full engagement of the mast is indicated by the label on the side of
the mast.
5. Remove the screw from the leg adjusting lever located at the rear of the chassis. Fit the
leg adjusting handle through the gate on the mast and push the open end over the leg
adjusting lever. Align the notch in the handle with the cross pin in the lever. The
handle is retained by a screw through the clearance hole in the handle into a threaded
hole in the lever. Insert screw and fully tighten.
For Stowaway please refer to page 11 for assembly instructions


Advertisement

Table of Contents
loading

Table of Contents