GE Zoneline AZ95H09 Owner's Manual And Installation Instructions page 23

Heat/cool pump
Table of Contents

Advertisement

Available languages

Available languages

Installing the Zoneline
10. Make electrical connections to unit (cont)
ELECTRICAL CONNECTIONS - DIRECT CONNECT
3. Make Wire Lead Connections Inside the Junction Box
UL-listed electrical connectors and techniques.
2. Select the applicable wiring situation and follow the
instructions accordingly:
• 1-Phase 220-240 VAC
When connecting the Zoneline to a single-phase
circuit for 230V applications:
should be identified by the installer using electrical
Connect the green lead of the power supply kit to
the power supply and branch circuit ground.
• 3-Phase 208 VAC
should be identified by the installer using electrical
Connect the green lead of the power supply kit to
the power supply and branch circuit ground.
• 3-Phase 253-277 VAC
When connecting the Zoneline to a three-phase
circuit for 265V applications:
lead of the power supply kit to the power supply
and branch circuit ground.
NOTICE:
Building supply wires and supply cord wires must both be
secured with zip tie and oriented vertically.
49-5000561 Rev. 1
APPLICATIONS
be connected to the branch circuit ground wire.
three screws removed earlier.
MUST
Secure wires
with zip tie
23

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents