30/40
4.4.9

Final operations

© Landis+Gyr
When all connections have been made to a CU-P4x, commissioning and
functional check can be performed according to section 4.5 and then:
If the communication unit is fitted in a meter, replace the terminal cover
and seal with a utility seal or
If the communication unit is fitted in a CU-adapter, replace the front
cover and terminal cover and seal both with utility seals.
Do not pinch cables
Lead the antenna cable into the grooved passage in the terminal cover and
ensure when positioning the terminal cover that the various connecting
cables of the communication unit are not pinched anywhere and that no
physical forces are acting on the antenna cable.
D000043188 en d – E65C – CU-P40, P41, P42 – User Manual
Installation/De-installation

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the E65C Series and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

This manual is also suitable for:

Cu-p40Cu-p41Cu-p42

Table of Contents

Save PDF