Panasonic SH-FX71 Service Manual page 15

Table of Contents

Advertisement

7.3.3.
Disassembly
P.C.B.
• Follow the (Step 1) - (Step 5) of item 7.3.1.
Step 1 : Detach 7P cable at connector (CN2).
Step 2 : Remove 3 screws.
Step 3 : Slide SMPS Module P.C.B. out from the clutch.
Caution : During assembling, ensure the SMPS Module
P.C.B. is seated properly.
of
SMPS
Module
7.3.4.
Disassembly of D-AMP P.C.B.
• Follow the (Step 1) - (Step 5) of item 7.3.1.
Step 1 : Detach 7P cable at connector (CN2).
Step 2 : Remove 3 screws.
Step 3 : Remove D-AMP P.C.B..
15

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sh-fx71gcSh-fx71gn

Table of Contents