Page 2
To be powered by 24V AC/DC. BLACK WIRE 24V ac-dc. Power supply - 24V / Ground eNode24V box to not be opened without RED WIRE prior authorization by Controlli. 24V ac-dc Power supply + 24V WHITE WIRE Control signal + 0-10V dc...
Page 3
NOTES Power supply must have a protection installed to prevent overloading and must be limited to a maximum of 100W. Installation must be performed by a certified electrician Disconnect existing actuator from BMS Existing 0-10V - 24V actuator (by different brands) is usually connected by default to an existing BMS or control system.
Page 4
FINAL STEP: COMMUNICATE WITH CONTROLLI Once the installation of this eNode is complete, turned ON correctly and with the registrazione@controlli.eu green LED on, please send to a picture of this page. ADD HERE THE EXTRA LABEL OF THE ENODE THAT...
Page 5
- Turn off the eNode by pressing the button - Turn ON the eNode by pressing the button again - Wait for approximately 3 minutes. If still the LED is off please contact Controlli Support. The eNode is studied to resist most weather...
Need help?
Do you have a question about the Enerbrain eNode24 and is the answer not in the manual?
Questions and answers