6.4 Procedure

Step 1. To transfer the data on the program card to MT-08, follow the steps below.
Necessary time: about 5 minutes
Step 2. To transfer the data from MT-08 to GP-90, follow steps below.
Necessary time: about 20 minutes
Steps
Insert program card into
MT-08's slot
Initializing of MT-08
Flash memory of MT-08
is cleared
Data transfer started
Data transfer completed
Turn off MT-08 and remove
program card
Steps
Connect MT-08 to GP-90.
Turn on MT-08.
MT-08 ready to communicate
Turn on GP-90
When the communication with
MT-08 is succeeded, three beep
sounds are heard. (GP-90 goes
normal
into
function with a
signal beep.)
Data transfer started
Data transfer completed
GP-90 powered-up again
automatically.
LED status
Four LEDs: on
Green (left) and Yellow (right): on
Yellow (right): on
Green (light) blinking ever 2
sec (If failed, red lighting.)
LED status
Four LEDs: on
Green (left) and Yellow (right):
blinking
Green
(left):
blinking,
Yellow (right): on
Green (left): on,
Yellow (right): off
Green (left): on
Yellow (right): blinking
Green (light) blinking ever 2 sec
(If failed, red lighting.)
25
6. Program Upgradation

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gp-90-dual

Table of Contents