Installation and Operating Instructions
CHAPTER 4
OPERATION
ATTENTION
Air purifier AirPal 900/1200 U
3�4 Power supply connection
IEC 60320 C15 power cable (3 m long) is supplied with the unit package. Use the power cable to connect the power supply
(Fig.9).
Fig�9
4�1 Operation
Push the switch to power the unit. The blue LED light indicates that the unit is running (Fig.10).
Fig�10
The unit may release odours due to the UVC radiation of the inner chamber during the initial commissioning
of the unit� However, this will automatically subside after a short time�
Push the switch
8
EN