Page 1
Solutions Murales PROSLAT inc. 225 Industriel blvd, Chateauguay (QC) J6J 4Z2 1 888 691-2944 Model # 65001 / JAN21 8 TOTE STORAGE RACK Assembly instructions TOOLS REQUIRED 1. Drill with #2 Phillips-Head Tip 2. #2 Philips head Screwdriver PARTS LIST 1.
Page 2
FRONT GRID ASSEMBLY Alignment dimples Alignment dimples down Holes down Holes down Other side Short side to floor Short side to floor Other side PARTS NEEDED: STEP 1 STEP 2 4 of #1 1 of #2 4 Horizontal crossbars (#1) inserted through 1 Center Vertical 1 Left front corner vertical (#4) and 1 right front (#2) Note: Slide horizontal crossbar into left side of center corner vertical (#5) Placed on horizontal crossbar.
Page 3
Congratulations! We hope you #08 x ¾ in. fastening screws. (#1). screws (#3) and plastic wall anchors (#4) if enjoy your Bin Warehouse tote needed. Note: If mounted into masonry or Note: Use a screwdriver, storage rack! drywall, drill three ¼...
Page 4
Solutions Murales PROSLAT inc. (hereafter Proslat) warrants its Bin Warehouse Rack against defects in material or workmanship for a lifetime period. Proslat will replace any defective Rack as long as it was installed and maintained according to the printed instructions. Any Proslat Bin Warehouse Rack replaced under the terms of the Lifetime Warranty inherits the remaining warranty period from the original purchase.
Need help?
Do you have a question about the 65001/JAN21 and is the answer not in the manual?
Questions and answers