Power Kit
1.
Power Kit
2.
Slide end of power kit into vertical
junction, Then slide back into other
vertical junction.
3.
Engage power tray latch.
4.
Connect end of power whip to the
next power block.
5.
Route powerway conduit around
junction glides at the base to the next
panel (5a), or through power trays
and vertical junction (5b), or staying
within the base trim area (5c).
NOTE: WIRE TIE THE
CONDUIT TO THE
VERTICAL JUNCTION
SO THE BASE TRIM
WILL INSTALL EASILY.
5a
Wire Tie
Conduit
1
NOTE: RETAINER
CLIPS ARE ATTACHED
TO ALL WIDTHS OF
POWER KITS.
5b
2
4
5a
5c
5b
NOTE: RETAINER CLIPS
ARE ATTACHED TO ALL
WIDTHS OF POWER KITS.
3
Page 2 of 10