GEM 1242PTAZ Assembly Instructions Manual

GEM 1242PTAZ Assembly Instructions Manual

Quarter turn actuator

Advertisement

GEMÜ 1242PTAZ
Mounting kit for pneumatic actuators
Assembly instructions
EN
Quarter turn actuator

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 1242PTAZ and is the answer not in the manual?

Questions and answers

Summary of Contents for GEM 1242PTAZ

  • Page 1 GEMÜ 1242PTAZ Mounting kit for pneumatic actuators Assembly instructions Quarter turn actuator...
  • Page 2 7. Connect open wire ends in a junction box with protection class IP20 and higher or outside the EX area. 2.1 Preparations for installation of the valve (quarter turn actuator) 1. Move the actuator A into zero position (actuator vented). 2. Remove the screw 1 from the trigger cam 2. GEMÜ 1242PTAZ 2 / 8 www.gemu-group.com...
  • Page 3 1 using the spring 2 and fix it in place using the operating bush 3. 3. Tighten the operating bush 3 by turning it 4. Affix the O-ring 5 and the adapter 6. clockwise. www.gemu-group.com 3 / 8 GEMÜ 1242PTAZ...
  • Page 4 2. Use the spanner flat 8 (WAF 27) of the travel sensor to tighten the electrical position indicator. 3. Turn the housing clockwise to align the pneumatic or electrical connections. 4. Initialize the product. GEMÜ 1242PTAZ 4 / 8 www.gemu-group.com...
  • Page 5 5 / 8 GEMÜ 1242PTAZ...
  • Page 6 GEMÜ 1242PTAZ 6 / 8 www.gemu-group.com...
  • Page 7 7 / 8 GEMÜ 1242PTAZ...
  • Page 8 Subject to alteration *88658837* 07.2019 | 88658837...

This manual is also suitable for:

1242

Table of Contents