Page 2
7. Connect open wire ends in a junction box with protection class IP20 and higher or outside the EX area. 2.1 Preparations for installation of the valve (quarter turn actuator) 1. Move the actuator A into zero position (actuator vented). 2. Remove the screw 1 from the trigger cam 2. GEMÜ 1242PTAZ 2 / 8 www.gemu-group.com...
Page 3
1 using the spring 2 and fix it in place using the operating bush 3. 3. Tighten the operating bush 3 by turning it 4. Affix the O-ring 5 and the adapter 6. clockwise. www.gemu-group.com 3 / 8 GEMÜ 1242PTAZ...
Page 4
2. Use the spanner flat 8 (WAF 27) of the travel sensor to tighten the electrical position indicator. 3. Turn the housing clockwise to align the pneumatic or electrical connections. 4. Initialize the product. GEMÜ 1242PTAZ 4 / 8 www.gemu-group.com...
Need help?
Do you have a question about the 1242PTAZ and is the answer not in the manual?
Questions and answers