Download Print this page

Maevi Energy Meter Installation And Configuration Manual

Three phase

Advertisement

Quick Links

Energy Meter – Three Phase
Installation and Configuration

Advertisement

loading

Summary of Contents for Maevi Energy Meter

  • Page 1 Energy Meter – Three Phase Installation and Configuration...
  • Page 2 Three Phase Energy Meter Specifications Electrical Contacts Connector Description Phase L1 Phase L2 Phase L3 Neutral Night Tariff Current Transformers Black Wire LED1 Relay On/Off LED2 Network Status Power Relay 100~240V/ac Relay Latch + Relay Latch - CTR1 Current Transformers 1 Red Wire...
  • Page 3 Button/Reset Button LED1 Indicator (ON/OFF) LED2 Indicator (STATUS) LED Indicators LED Status What it means LED1 On Relay Switch On LED1 Off Relay Switch Off LED1 Slow Blinking LED2 Off Idle state, not associated with a network, waits for Man/Machine interaction LED1 Fast Blinking LED2 Off Beacon state, not associated with a network, in “ready to join”...
  • Page 4 Wiring Diagram for Three Phase Energy Meter...
  • Page 5 1. Install the Energy Meter at your electrical distribution board (DB) per the above diagram. 2. Open Maevi Smart Home App and go to "Home Automation" tab, click "+" button at the bottom right corner of the app to start the pairing process.
  • Page 6 5. n the App, go to "Energy Monitoring" page and pull it down and release to refresh it. The Energy Meter should now appear in the App as Meter #. 6. Click on the Meter # to verify the setup and make sure the Energy Meter is correctly installed. The Active Power value should be in positive.

This manual is also suitable for:

102.363.000003