Installation

Pre-Installation

General installation checks

If the content of the machine's name plate is the same as that of the order.
• If there is any damage or material shortage during transportation of the unit; if yes, please notify the

Installation position

• If there is adequate ventilation available at the installation position.
• If drainage facilities are installed for handling the seeper at the pedestal.
• Unpack the water chill er and dispose the packing materials (such as paperboard, prospective film
• If there are enough repair passages available.
• Fit springs or rubber shockproof gaskets.
• Fix the unit in its installation position.
• Adjust the levelness of the water chiller.
Adoption of the following water chiller fixing methods can minimize the noise of the water chiller:
• Install the unit on an independent concrete foundation.
• Fit spring or rubber shockproof gasket at each fixing foot.
For overall dimension of the water chiller and the dimension of the foundation, please refer to
Figure 2. For recommended minimum maintenance space, please refer to Figure 3.
CGAR(K)0606R/1005R
CGAR(K)0305R/0306R/0505R/0605R/0755R
10
deliverer timely.
and etc.).
1630
450
730
850
1630
150
640
640
640
402
950
2330
450
CGAR(K)1205R/1505R/2005R
450
393
Figure 2. Installation dimensions
1630
730
850
1630
150
640
640
2330
PKGP-SVX03D-EN
450

Advertisement

Table of Contents
loading

Table of Contents