Download Print this page

Adjusting The Stand Height; Setting Up The Measuring Base Station - Yealink DECT IP Multi-Cell Deployment ToolKit Quick Start Manual

Hide thumbs Also See for DECT IP Multi-Cell Deployment ToolKit:

Advertisement

Available languages

Available languages

E
N

Adjusting the Stand Height

G
L
I
S
H
Note:
The stand height can be adjusted from 3.28 feet (1.00 meter) to 9.19 feet (2.80 meters).

Setting up the Measuring Base Station

1. Mount the measuring base station on the stand
1
Position the thread of the base station clip on the stand and screw the base station clip into place.
2
Fix the base station on the base station clip.
Note: In order to better transmit and receive radio signal, we recommend that you place the base station
vertically with one end of the
front side of the base station faces to the buckle.
3
Adjust the angle of the base station to an appropriate position.
2
2
1
button facing up. To make the base station more secure, make sure the
3

Advertisement

loading
Need help?

Need help?

Do you have a question about the DECT IP Multi-Cell Deployment ToolKit and is the answer not in the manual?