Palram SUNTUF Ez-Glaze Installation Manual
Palram SUNTUF Ez-Glaze Installation Manual

Palram SUNTUF Ez-Glaze Installation Manual

Advertisement

Quick Links

SUNTUF® Ez-Glaze
UV Resistance
Snow Load
Wind Resistance
Aesthetics
Easy To Install
SUNTUF® Ez-Glaze
PALRAM Webseite
- Product Page

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SUNTUF Ez-Glaze and is the answer not in the manual?

Questions and answers

Summary of Contents for Palram SUNTUF Ez-Glaze

  • Page 1 SUNTUF® Ez-Glaze Installation Guide UV Resistance Snow Load Wind Resistance Aesthetics Easy To Install SUNTUF® Ez-Glaze PALRAM Webseite - Product Page...
  • Page 2 ‚ To ensure proper water runoff, slope should be at least 5% (50mm rise over 1m length). ‚ Place the first SUNTUF Ez-Glaze panel on the rafters, leaving 50-150mm overhang. ‚ Pre-drill 10 mm holes along the outer corrugation, every 500mm.
  • Page 3 50mmx6.5mm with 25mm EPDM washer Fix the first SUNTUF Ez-Glaze panel’s outer corrugation, using specified screws and Fix both panels overlap, using specified screws and washers through the pre-drilled washers through the pre-drilled holes. Start at the bottom edge and work your way up.
  • Page 4 Installation Side Wall Flashing in case the panel is trimmed (Not supplied by Palram) Packer Packer Packer Packer Metal Flashing Metal Flashing Metal Flashing Metal Flashing Metal Flashing Metal Flashing Aluminum "F" pro le Aluminum "F" pro le Aluminum "F" pro le Aluminum "F"...

Table of Contents