Download Print this page

Screen Technics INTERFIT FVI Series Instructions Manual page 2

Projector lift

Advertisement

INSTRUCTIONS - INTERFIT
verhead structure with a proprietary loxin
d.
ALL-THREAD BROOKER ROD
sions of the unit.
STEP 1.
Secure 4 x brooker rods to a suitable overhead
e installation height and then insert the rods
structure with a proprietary loxin system designed to
ow attached to the lifter unit.
accept threaded rod.
acket till the ceiling edge trims are firmly
eiling material, then wind the upper nuts down
STEP 2.
Space around the outside corner dimensions of
.
the unit.
STEP 3.
Wind a set of nuts up the rods above the installation height and then insert the rods
to the roof space but this is not always possible, and in these
through the supplied angle brackets, now attached to the lifter unit.
STEP 4.
Now wind on a set of nuts under the bracket till the ceiling edge trims are firmly
pressing against the underside of the ceiling material, then wind the upper nuts down
onto the angle brackets to lock off unit.
unit and support the lifter so you can motor the projector cage
ou will see 6 Allen key bolts holding the cage assembly to the unit.
Installations are best achieved by have access into the roof space but this is not always
nit.
possible, and in these instances we advise the following practices:
by removing the 2 Allen key bolts at the front under side of plate
e lifter assembly.
ll up position (watch out for your fingers...) and you now have room
INSTALLING FROM BENEATH THE CEILING LINE
STEP 1.
Connect power in a safe manner to the unit and support the lifter so you can motor the
up the corner frame uprights. These are used to secure the device
projector cage lower than the ceiling edge trims and you will see 6 Allen key bolts holding the
the ceiling line.
cage assembly to the unit. Remove these and set aside the cage unit.
long two sides to coach bolt into place or suspend from threaded
STEP 2.
Remove the projector mounting plate by removing the 2 Allen key bolts at the front
crews or bolts (as appropriate to selected method) and apply
under side of plate and pull the forward to remove from the lifter assembly.
ng edge trims are pressed firmly against the underside of the
ews or bolts.
STEP 3.
Motor the remaining assembly to the full up position (watch out for your fingers...) and
he projector plate and cage assembly.
you now have room to access the interior of the unit.
STEP 4.
Inspect the 8 installation slots running up the corner frame uprights. These are used to
tallation from beneath the ceiling, it is best to use a method of
secure the device to some suitable structure from below the ceiling line.
date to remove the lifter for any future servicing issues, without
his issue before deciding on the best installation method.
STEP 5.
Either add some timber in the ceiling along two sides to coach bolt into place or suspend
from threaded rod or some suitable angle brackets.
PROJECTOR LIFT – FVI and HTI Series
Projector Installation
This unit comes with a blank projector mounting plate that requires you to mark
out the mounting holes and drill where appropriate.
Removal of the plate for drilling and fitting is achieved by undoing the 2 off
Allen key bolts along the front underside edge of the mounting plate, and
pulling the plate forward.
These 2 off Allen key bolts will later be the adjustment method used for yaw or
side to side alignment of the projector, with the threaded adjustment winder
used for pitch or up and down adjustment of projector.
For ease of adjustment and cable fitting the ceiling plate can be removed from
the projector shroud assembly by undoing the 6 x Allen key bolts that surround
the ceiling plate from the outside perimeter of the shroud, as below.
Cable Management for Units with 200mm to 600mm Travel
The rear of the projector mounting plate has a cable management access hole that
allows you to run cables through and into the cable management channel.
STEP 6.
Raise the unit into the ceiling, fit the screws or bolts (as appropriate to selected method)
and apply upward pressure to the unit so the ceiling edge trims are pressed firmly against the
underside of the ceiling material and tighten off the screws or bolts.
STEP 7.
Motor down the mechanism and refit the projector plate and cage assembly.
PLEASE NOTE:
When utilising the above method of installation from beneath the ceiling, it is best
to use a method of fixing to any structure that will allow you at a latter date to remove the lifter
for any future servicing issues, without the need to break into the ceiling – please consider this
issue before deciding on the best installation method.
PROJECTOR INSTALLATION
STEP 1.
This unit comes with a blank projector mounting
plate that requires you to mark out the mounting holes
and drill where appropriate.
Projector Installation
Projector Installation
This unit comes with a blank projector mounting plate that requires you to mark
STEP 2.
Removal of the plate for drilling and fitting is
This unit comes with a blank projector mounting plate that requires you to mar
out the mounting holes and drill where appropriate.
achieved by undoing the 2 off Allen key bolts along the
out the mounting holes and drill where appropriate.
Removal of the plate for drilling and fitting is achieved by undoing the 2 off
front underside edge of the mounting plate, and pulling
Removal of the plate for drilling and fitting is achieved by undoing the 2 off
Allen key bolts along the front underside edge of the mounting plate, and
the plate forward.
Allen key bolts along the front underside edge of the mounting plate, and
pulling the plate forward.
pulling the plate forward.
These 2 off Allen key bolts will later be the adjustment method used for yaw or
STEP 3.
These 2 off Allen key bolts will later be the adjustment method used for yaw or side to
These 2 off Allen key bolts will later be the adjustment method used for yaw or
side to side alignment of the projector, with the threaded adjustment winder
side alignment of the projector, with the threaded adjustment winder used for pitch or up and
side to side alignment of the projector, with the threaded adjustment winder
used for pitch or up and down adjustment of projector.
down adjustment of projector.
used for pitch or up and down adjustment of projector.
For ease of adjustment and cable fitting the ceiling plate can be removed from
For ease of adjustment and cable fitting the ceiling plate can be removed from
the projector shroud assembly by undoing the 6 x Allen key bolts that surround
the projector shroud assembly by undoing the 6 x Allen key bolts that surround
STEP 4.
For ease of adjustment and cable fitting the ceiling plate can be removed from
the ceiling plate from the outside perimeter of the shroud, as below.
the projector shroud assembly by undoing the 6 x Allen key bolts that surround
the ceiling plate from the outside perimeter of the shroud, as below.
the ceiling plate from the outside perimeter of the shroud, as below.
2
Continued Over.../

Advertisement

loading

This manual is also suitable for:

Interfit hti series