PLEASE READ INSTRUCTIONS CAREFULLY.
For Assistance Please Contact Customer Care on
Please retain product label and instructions for future reference
Drill
2mm bit
For ease of assembly, it is
advisable to pilot drill all
screw holes and ensure all
screw heads are countersunk.
WINTER = HIGH MOISTURE = EXPANSION
SUMMER = LOW MOISTURE = CONTRACTION
x2
*Shiplap version
shown in illustrations
This building should be erected by two people.
Tools required for installation (not supplied)
Screwdriver (cross point), Stanley knife, wood saw
and step ladders.
Before you start...
All buildings including the underside of the floor must be treated with a good quality waterproof
preservative or treatment prior to or during assembly, and retreated annually.
Preservative/treatments are available in a choice of colours and is left to the customers preference.
NATURAL MOVEMENT OF TIMBER THROUGHOUT THE SEASON
Timber is a natural material and will, during the year pick up moisture in damp periods and dry out during hot spells. There will be constant expansion
and contraction of the timbers which will be particularly noticeable during the dry periods as the boards will shrink, this is why all buildings have
slight tolerances built into them.
BUILDING A BASE
When thinking about where the building and base is going to be constructed: Ensure that there will be access to all sides for maintenance work and
annual treatment.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Ensure the base is level and is built on rm ground, to prevent distortion. Refer to diagrams for the base dimensions, The base should be slightly
smaller than the external measurement of the building, i.e. the cladding should overlap the base, creating a run o for water. It is also recommended
that the oor be at least 25mm above the surrounding ground level to avoid ooding.
Whilst all products manufactured at Walton Garden Buildings Limited are made to the highest standards of Safety and in the case of
childrens products independently tested to EN71 level, Walton Garden Buildings Limited cannot accept responsibility for your safety whilst
erecting or using this product.
01636880514
Dimensions
Height = 1960mm
Width = 1786mm
Depth = 797mm
Front Panel
Gable x2
(Shiplap only)
Floor Panel
Door x2
Gable tops
(Shiplap only)
2x Door block -140mm
Iron mongery & Nail Bag Contents
Door hinge x4
Pad bolt
Turn Key x2
Rear Panel
Gable x2
(Overlap only)
Roof Panel
Felt
Eave Framing-1786mm
4x Corner Trim -1759mm (Shiplap only)
Rear Fascia -1810mm
2x Side Fascia -830mm
2x Corner Trim -1918mm (Overlap only)
2x Corner Trim -1818mm (Overlap only)
10mm Felt Tacks x80
30mm Screw x80
40mm Screw x15
50mm Screw x30

Advertisement

loading

Summary of Contents for Walton 01OSBP0602

  • Page 1 Turn Key x2 Whilst all products manufactured at Walton Garden Buildings Limited are made to the highest standards of Safety and in the case of childrens products independently tested to EN71 level, Walton Garden Buildings Limited cannot accept responsibility for your safety whilst...
  • Page 2 Step 1 Step 4 Remove transportation blocks Fix door gable and front panel from the bottom of each panel using same method shown in before beginning assembly. step 3. Each Panel should have two blocks. Step 2 Assembly Place floor on a firm and level base, ensure base has suitable drainage free from areas where standing water...
  • Page 3 Step 9 Step 6 Use 3x30mm screws to fix Fix Eave framing to edge of each cover trim. Roof sheet using 4x30mm screws. Place roof into position ensuring the eave frame fits butt against the panel cladding. Fix using 10x30mm screws as shown in diagram.