Download Print this page

Walton 01OSBP0602 Instructions page 3

Advertisement

Step 6
Fix Eave framing to edge of
Roof sheet using 4x30mm
screws.
Place roof into position ensuring
the eave frame fits butt against
the panel cladding. Fix using
10x30mm screws as shown in
diagram.
*
Fix eave frame to
roof sheet first
Step 7
Lay sheet of felt onto roof as
50mm
shown in diagram ensuring
Overhang
there is a 50mm overhang
around the sides.
Fix using felt tacks at 100mm
intervals
100mm
intervals
Step 8
Fix hinges to the doors with
30mm screws ensuring the
screws are located into the door
framing.
Position each door on to the
building leaving a 2mm gap in
between doors and building. Fix
the door to the building with
30mm screws.
Fix pad bolt with 6x30mm screws
*Fix door block and turn key to
to horizontal door brace.
top and bottom of door with bolt
retainer fitted, using 30mm
Then fix the pad bolt retainer to
screws.
the opposite door framing using
4x30mm screws.
14 x 30mm screws
80 x Felt Tacks
1mm
30mm
screws
44 x 30mm screws
Step 9
Use 3x30mm screws to fix
each cover trim.
Step 10
Fit fascia boards to
building using 3x40mm
screws per board as shown
in diagram.
Pre drill holes before hand,
making sure screws go into
the framing.
9 x 40mm screws
12 x 30mm screws

Advertisement

loading

This manual is also suitable for:

01ovlp0602v1