PowerSpout
5.2.1.
Dig holes and position the 4 corner posts as shown
Posts are 2.1m long, 1.0m in the ground and dry mix concrete rammed to secure in place.
5.2.2.
Position trussed frame
Bolt or use several long tek screws to secure truss at each post location.
The late afternoon shadow confirms the trussed frame is mounted East/West.
© 2019 EcoInnovation Ltd (NZ) V2.1
React Pump Installation
Page 78
Need help?
Do you have a question about the React Pump and is the answer not in the manual?