Dig Holes And Position The 4 Corner Posts As Shown; Position Trussed Frame - EcoInnovation React Pump System Design And Installation Manual

Table of Contents

Advertisement

PowerSpout
5.2.1.

Dig holes and position the 4 corner posts as shown

Posts are 2.1m long, 1.0m in the ground and dry mix concrete rammed to secure in place.
5.2.2.

Position trussed frame

Bolt or use several long tek screws to secure truss at each post location.
The late afternoon shadow confirms the trussed frame is mounted East/West.
© 2019 EcoInnovation Ltd (NZ) V2.1
React Pump Installation
Page 78

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the React Pump and is the answer not in the manual?

Table of Contents