System Check List - Trane Thermo King TriPac EVOLUTION Installation Manual

Auxiliary heating and cooling temperature management system
Table of Contents

Advertisement

System Check List

APU Mounting Bolts Positioned, Tightened and Torqued to Specs.
Coolant Hoses Routed and Secured Properly
Condenser Mounting Bolts Secured and Sealed with Silicone
A/C Receiver Drier Mounting Bolts Secured
A/C Evaporator Mounting Bolts Secured
Evaporator Drain Tube Water Valves (Kazoos) Installed
A/C Refrigeration Tubing Routed and Secured
All Wiring Harnesses Routed, Connected and Secured
A/C System Charged, Free of Leaks and Operates Correctly
Heater Intake and Exhaust Hoses Routed Safely and Secured
Heater System Operates Correctly
All Fuel Lines are Routed Safely and Secured
All Fuel Line Connections are Tight and Leak Free
All Guards, Covers and Grilles Installed Securely
3" access hole in the sleeper floor is completely caulked from both inside and underneath
Verified any unused holes in the sleeper floor are completely sealed closed with caulking
All System Run-In Procedures Performed
Coolant Levels for Truck and APU are Topped Off
Unit Operated For 10 Hours
Thoroughly Clean and Vacuum Interior of Sleeper
Release to Customer
TK 55676-19-IM-EN
A A / / C C S S y y s s t t e e m m C C h h a a r r g g i i n n g g a a n n d d A A P P U U E E n n g g i i n n e e S S t t a a r r t t - - u u p p P P r r o o c c e e d d u u r r e e s s
95

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents