16. Set B B a a t t t t e e r r y y V V o o l l t t a a g g e e R R e e s s t t a a r r t t V V a a l l u u e e :
a. Determine truck low voltage alarm setting.
b. Set TriPac Battery Voltage Restart Value to at least 0.2 volts higher than truck alarm setting. (Default 12.2 volts) -
should not be higher than 12.4 volts.
c. TriPac EVOLUTION Unit Setup Procedures
17. Make any customer directed changes to other programmable settings.
18. Set Real Time Clock:
a. Click on the Set System Clock check box.
b. The Real Time Clock will be set to the time on the connected computer.
19. Select U U p p d d a a t t e e S S e e t t u u p p :
a. Setup information will be saved.
b. Controller will restart so selections will take effect.
c. TK Monitor will lose connection and must be restarted.

Service Run-In Test

Before delivery of a TriPac EVOLUTION unit to the customer it must complete a 10 hour run-in with the engine under
load. The Run-In Test in the Service Test screen will cause both the air conditioning system (using a low temperature
setpoint) and the heating system (using a high temperature setpoint) to run for 10 hours.
N N o o t t e e : : For additional information about TK Monitor refer to Diagnostic Manual TK 55739, Section 6, A51A,
Communication Using TK Monitor.
1. Verify there is sufficient fuel in the fuel tank to operate the system for 10 hours.
2. C C l l o o s s e e d d L L o o o o p p C C o o o o l l i i n n g g O O p p t t i i o o n n O O n n l l y y - Place a clean container under the overflow hose of the APU's overflow tank.
This is to catch any coolant that may be expelled during the initial 10 hour engine run-in.
3. Start TK Monitor. Select S S e e r r v v i i c c e e T T e e s s t t from the menu.
4. On the Service Test Screen select R R u u n n I I n n Test.
TK 55676-19-IM-EN
A A / / C C S S y y s s t t e e m m C C h h a a r r g g i i n n g g a a n n d d A A P P U U E E n n g g i i n n e e S S t t a a r r t t - - u u p p P P r r o o c c e e d d u u r r e e s s
Figure 53. Programmable Setup Screen Shown
RCS1669