Electrical Installation - Cedes cegard/Max-NT Installation And Operation Manual

Light curtain for elevator door protection
Table of Contents

Advertisement

Installation and Operation Manual

4.4. Electrical Installation

When the supply voltage or the voltage at the relay terminal is below 42 volts, use the standard cable entrance gaskets
to connect the transmitter, the receiver, the output relay and power.
Connect all wiring with more than 42 V through a Greenfield Fitting.
Disconnect power before opening the control unit to prevent electrical shock.
Figure 6: Final installation with Greenfield Fittings (e.g. from Thomas & Betts or other UL / CSA approved manufacturer)
Figure 7: Wiring diagram
© CEDES
Do not remove inside cover or fuse cap.
www.cedes.com
cegard/Max-NT
7

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cegard/max

Table of Contents