Final Check List

After connections,
1. Wash out the bin. If desired, the interior of the
bin could be sanitized.
2. Locate the ice scoop (if supplied) and have it
available for use when needed.
Final Check List:
1. Is the unit located indoors in a controlled
environment?
2. Is the unit located where it can receive
adequate cooling air?
3. Has the correct electrical power been supplied
to the machine?
4. Have all the water supply connections been
made?
5. Have all the drain connections been made?
6. Has the unit been leveled?
7. Have all unpacking materials and tape been
removed?
8. Is the correct switch bezel installed in the trim
strip?
9. Is the water pressure adequate?
10. Have the drain connections been checked for
leaks?
11. Has the bin interior been wiped clean or
sanitized?
12. Have any water filter cartridges been replaced?
13. Have all required kits and adapters been
properly installed?
Air and Water Cooled User Manual
July 2006
Page 11
C0322 through C1030

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

C0522C0330C0530C0630C0830C1030

Table of Contents