Download Print this page

Waltons 12x8 COMBI SUMMERHOUSE V7 General Instructions Manual page 8

Advertisement

Step 17c
Screw through panel into the alligned
Roof bearers as shown in the diagram.
Do not secure the building to the
Floor until the roof is tted.
*External panels not shown
8x50mm Screws
50mm
Pre drill
screw
hole
Step 18a
Once the Roof is alligned and secure the
Floor can be xed into postion.
Fix the building into place by screwing
through the panel into the oor making
sure to screw into the oor bearers.
*External panels not shown
64x50mm Screws
50mm
Pre drill
screw
hole
Please retain product label and instructions for future reference
Step 18b
Continue to x the building into place by
screwing through the panel into the oor
making sure to screw into the oor bearers.
*External panels not shown
50mm
Pre drill
screw
hole
Step 19
Place the Under Roof (No. 12) into position,
making sure it is ush to the Door panel
and Storage section.
Fix in place making sure to screw through
the Roof framing. Pre-drill holes rst.
15x30mm Screws
12
P 8

Advertisement

loading

Related Products for Waltons 12x8 COMBI SUMMERHOUSE V7