Advertisement

USE AND
MAINTENANCE MANUAL
Swing gates
Rev.00 28/07/2016

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the BE20 Series and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Roger Technology BE20 Series

  • Page 1 USE AND MAINTENANCE MANUAL Swing gates Rev.00 28/07/2016...
  • Page 2: Safety Precautions

    1 Safety precautions Failure to observe the information given in this manual may result in personal injury or damage to the equipment. These instructions are an integral part of the product and must be handed to the user. Read these instructions carefully, as they provide important information concerning the safety, use and maintenance of the installation.
  • Page 3: Maintenance

    Agree upon a periodical maintenance schedule with the installer. ROGER TECHNOLOGY recommends servicing at 6 month intervals for normal usage. However, the frequency of maintenance intervals may vary depending on intensity of usage.
  • Page 4 4 Unlock instructions BE20 - BR20 - R20 Series UNLOCKING included in the lock and turn clockwise by 90° the gate manually. LOCKING WARNING: operate the lock release lever with Close the lock release lever. Insert the key included into the lock and turn clockwise by 90°. Once the lock release lever has returned to its original position, turn the key anticlockwise, remove from the lock and close the lock cover.
  • Page 5 R23 Series UNLOCKING . Turn the lever by Manoeuvre the gate manually. Fig. 1 LOCKING WARNING: operate the lock release lever with caution to position. Insert the key and turn anticlockwise, remove from the lock and close the lock cover. Fig.
  • Page 6: Troubleshooting

    5 Environmental requisites ROGER TECHNOLOGY products consist of electronic components and may also be equipped with batteries containing substances that are harmful to the environment. battery. correctly of products when no longer in use will contribute to preventing harm to the environment and to human health.
  • Page 7: Installation Details

    7 Installation details INSTALLER COMPANY Trading name Address (Street No, street etc.) PO CODE City Prov. Telephone no. E-mail INSTALLER Name Surname Mobile E-mail Client Name Surname Installation site address (Street No, street etc.) PO CODE City Prov. Telephone no. E-mail INSTALLATION APPLICATION COMMERCIAL...
  • Page 8 PRODUCTS INSTALLED MOTOR CONTROL UNIT ROGER BRUSHLESS BRUSHLESS Rev. B R U S H L E S S OTHER COMPANY BRUSHLESS BRUSHLESS BRUSHLESS RADIO RECEIVERS AND REMOTE CONTROLS RADIO RECEIVER ROGER OTHER COMPANY H93/RX22A/I R93/RX12A/I R93/RX14M/24 H93/RX2RC/I R93/RX2RC/U E80/TX2R/RC E80/TX52R/2 E80/TX54R/2 E80/TX4R/RC H80/TX22...
  • Page 9: Additional Accessories

    ACCESSORIES ACCESSORIES ROGER OTHER R85/60ES COMPANY R85/60EAS R85/60EAS/TRIX R85/60EAE R85/60EAE/TRIX ADDITIONAL ACCESSORIES Installer Client...
  • Page 10: Maintenance Log

    8 Maintenance log Corrective action of maintenance company Replacement Signature for acceptance...
  • Page 11 Corrective action of maintenance company Replacement Signature for acceptance...
  • Page 12 Corrective action of maintenance company Replacement Signature for acceptance...
  • Page 13 Corrective action of maintenance company Replacement Signature for acceptance...
  • Page 14 Corrective action of maintenance company Replacement Signature for acceptance...
  • Page 15 Initial test report CLIENT COPY Installer details CLIENT Name Surname Address of installation City Telephone no. E-mail THE AFOREMENTIONED PRODUCT HAS SUCCESSFULLY PASSED INITIAL TESTING PRELIMINARY CHECKS FUNCTIONAL TESTS Test opening and closing of system unconnected to gate In-built safety devices undamaged Start and stop devices No visible defects Emergency stop devices...
  • Page 16 CLIENT COPY The report certifying the successful outcome of the initial tests described above constitutes proof of conformity of the product itself; declares that they have received the use and maintenance instructions for this product, that they have read the instruc- tions and that they will make the instructions available to any person authorised to use the product.
  • Page 17 Initial test report INSTALLER COPY Installer details CLIENT Name Surname Address of installation City Telephone no. E-mail THE AFOREMENTIONED PRODUCT HAS SUCCESSFULLY PASSED INITIAL TESTING PRELIMINARY CHECKS FUNCTIONAL TESTS Test opening and closing of system unconnected to gate In-built safety devices undamaged Start and stop devices No visible defects Emergency stop devices...
  • Page 18 INSTALLER COPY The report certifying the successful outcome of the initial tests described above constitutes proof of conformity of the product itself; declares that they have received the use and maintenance instructions for this product, that they have read the instruc- tions and that they will make the instructions available to any person authorised to use the product.
  • Page 19 ROGER TECHNOLOGY is the exclusive proprietor holder of all rights regarding this publication. scanning or any alterations to this document are prohibited without express prior authorised from by ROGER TECHNOLOGY.
  • Page 20 ROGER TECHNOLOGY www.rogertechnology.com...

Table of Contents

Save PDF